Skip to content

Powerline Park – Bike Trails

Story

The proposed Powerline Park Bike Trails project would construct approximately 1.46 miles of bike and multi-use trails and trail improvements across approximately 8.14 acres of project area and .75 acres of construction area. The project includes a rotary connection to 4 bike trails, which includes three flow trails with cross-over connections (beginning, intermediate, and advanced) and a Cross Country (XC) Trail (with optional skills features) that connects to a 750 LF pump track to the east and a loop trail to the west, viewing areas, and necessary signage. The design reflects the restrictions of the PG&E and SMUD easements on the land, which does not allow for permanent structures or grade changes.